Manufactured Equipment

Built to Perform

Scalable from 50 MW and beyond, your PROENERGY solution features all major components, including turbines and packages made in-house. This modular, standardized equipment is test-fit in our factory for repeatable, efficient installation backed by our engineering support teams.

100%

On-Time Delivery

150

Units Booked

99%

Start Reliability

PE6000

Ideal Dispatchable Generation Machine

The PROENERGY PE6000 generates 50 MW of fast-start power and operates on multiple fuels, making it a versatile choice for any application.

LEARN MORE

PACKAGE

Standardized. Modular. Identical.

Fabricated, painted, and assembled on our Sedalia campus, each package is identical from one to the next with features that make installation faster, maintenance easier, and emissions lower.

SPECIFICATIONS

50.2

MW

Gross Output

8,800

Btu/kWh

Gross Heat Rate

5

MIN

Startup

Additional Standard Equipment

Generation That Beats the Heat

Our power augmentation standard includes water-spray injection and fogging equipment to maximize output when temperatures rise.

Cool and Confident

Our proven anti-icing system delivers zero gas-turbine power loss and enclosed skids for resilience in 40°F (4.4°C) and below. Optional tank heaters, heat tracing, and insulation ensure resilience to −25.6°F (−32°C).

State of the Art for Air Quality

Our modern system meets emissions requirements while maintaining efficiency with an exhaust stack, an ammonia system, and selective catalytic reduction / carbon monoxide (SCR/CO) catalyst proven to reduce nitrous oxide (NOx) and carbon monoxide discharge by 90 and 95 percent, respectively.

Custom-Built Logic

Our power distribution center (PDC) has a logical layout for operating two generating units, and it includes a tailor-made enclosure, control panels, electrical equipment, and cabinets.

Unlock Efficiency

Using Allen-Bradley ControlLogix® hardware with FactoryTalk® software, our modern, open-source control system operates the turbine, generator, and balance of plant (BOP) systems while easily integrating with your other plant equipment.

One Consolidated Platform

Assembled all in one, our auxiliary skid saves hundreds of hours during installation, simplifies maintenance with a gearbox-less water pump, and facilitates winterization using a standard enclosure.

TRACK RECORD

150+ Packages Booked

The PROENERGY Center of Excellence for Manufacturing in Sedalia is a state-of-the-art investment in turbine and package production. We specialize in advanced manufacturing and heavy fabrication to deliver installation-ready equipment all over the world.

See Our Other Solutions

Total Delivery. Double the Speed: Complete power facilities featuring 2x PE6000 power blocks, installed in half the time of competitors
CAPEX-Free, Guaranteed Energy: PROENERGY secured $2 billion in financing and developed 2.4 GW in four years to create the world’s
For the Life of Your Turbine: PROENERGY delivers 120-day major overhauls with 99% on-time delivery and 24/7 engineering support for
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.