Skip to main content

Engineered Solutions for Peak Efficiency

PROENERGY keeps you up to date and operating at maximum performance. Our solutions include anti-icing, fogging, wet compression, and controls upgrades that enhance turbine and plant operation in any environment.

100%
Turnkey
Anti-Icing Solution
10%
Performance
Increase With Fogging
ZERO
Power Loss With
Anti-Icing Technology

Unlock Efficiency

Designed and built in-house, our modern, open-source controls systems give you the freedom to integrate technology across your asset, receive immediate assistance with troubleshooting, source parts for quick replacement, and more.

Prepare Your Turbine to Beat the Heat

Increase output by 10 percent. By cooling air in the gas-turbine inlet, our fogging solution maximizes the power output of your system while lessening the stress of rapid cycling and starts, especially during the peak hours of hot summer months.

WET COMPRESSION

Cool Down Under Pressure to Power Up

By injecting water into the compressor inlet, our wet-compression solution helps to recover power loss and increase operational flexibility, particularly in hot, humid climates with high ambient temperatures.

Protect Plant Reliability in Cold Weather

For LM6000 power plants operating at 40°F (4.4°C) and below, our field-proven and in-house-developed anti-icing system—including all controls, testing, and energization—is delivered 100 percent turnkey and results in zero gas-turbine power loss.

100% Availability
During Winter Storm Uri