Not Every Package Has The Metal To Be ProCertified

Prior to a package being inducted into the PROENERGY certification program, it must first have the right pedigree. Only equipment that has been properly maintained and documented, meeting pre-qualified fired starts and fired hours, are accepted for inspection.

We Are Built For This

PROENERGY's North American campus was designed specifically for turbine engine overhauls and package re-manufacturing. Our state-of-the-art Aero Depot, Component Repair facility and Metallurgy Labs were designed and engineered to the specific needs of the turbines we specialize in.

+ Corporate Office
+ FastTrack Solutions + Equipment
+ Paint Shop
+ Fabrication Facility
+ Fuel Systems
+ Turbine Services
+ Packaging Solutions
+ Warehouse

Corporate Office

Offices for our HR, IS/IT and Accounting Teams

FastTrack Solutions + Equipment

A global service provider of equipment and replacement parts for all major aeroderivative and heavy industrial gas turbine technologies.

Paint Shop

Environmentally controlled, closed environment, that specializes in power plant industrial coatings and structural steel.

Fabrication Facility

55,000 sq. ft. facility to manufacture, retrofit, install, and test a variety of steel products.

Fuel Systems

Provide cost-effective quality solutions to solve fuel nozzle operational issues and provide our customers with innovative repairs.

Turbine Services

53,000 sq. ft. state-of-the-art facility dedicated to meeting all turbine component repair and refurbishment needs.

Packaging Solutions

167,000 sq. ft. manufacturing facility dedicated to the assembly of turbine engine driven packages. This facility also houses the Aero Depot, a service center for aeroderivative gas turbine engines.

Warehouse

225,000 sq. ft. parts and equipment warehouse.

1,000+ Point Inspection Is Just The Beginning

Learn more about our ProCertified processes

  • Search Icon
    1,000+
    Point Inspection
  • Controls Icon
    Controls
  • Tracking Icon
    Tracking
  • Certification Icon
    Certification
  • Overhaul Icon
    Turbine & Generator Overhaul
  • Ready-To-Fire Icon
    Ready-to-Fire
    Parts
  • History Icon
    History
  • Turbine Icon
    Turbine Leasing
  • Warranty Icon
    Warranty
  • Search Icon
    1,000+
    Point Inspection
  • Controls Icon
    Controls
  • Tracking Icon
    Tracking
  • Certification Icon
    Certification
  • Overhaul Icon
    Turbine & Generator Overhaul
  • Ready-To-Fire Icon
    Ready-to-Fire
    Parts
  • History Icon
    History
  • Turbine Icon
    Turbine Leasing
  • Warranty Icon
    Warranty

LM6000 Package Refurbishment

  • Date  1.26.15
  • Process  Turbine Enclosure
  • 1 of 15
  • Date  2.3.15
  • Process  Turbine Enclosure
  • 2 of 15
  • Date  2.11.15
  • Process  Main Turbine Terminal Panel
  • 3 of 15
  • Date  3.24.15
  • Process  Auxiliary Skid
  • 4 of 15
  • Date  4.23.15
  • Process  Inlet Volute
  • 5 of 15
  • Date  5.18.15
  • Process  Turbine Enclosure
  • 6 of 15
  • Date  6.10.15
  • Process  Balance
  • 7 of 15
  • Date  6.22.15
  • Process  Inlet Frame Installation
  • 8 of 15
  • Date  6.24.15
  • Process  Roof Skid (after)
  • 9 of 15
  • Date  6.30.15
  • Process  LPT Installation
  • 10 of 15
  • Date  8.18.15
  • Process  Turbine Enclosure (after)
  • 11 of 15
  • Date  9.2.15
  • Process  Generator Skid (in Paint Shop)
  • 12 of 15
  • Date  9.23.15
  • Process  Engine Test Fit
  • 13 of 15
  • Date  9.29.15
  • Process  Engine Test Fit
  • 14 of 15
  • Date  2.8.16
  • Process  Shipping to Site
  • 15 of 15

Process Documentation

Aero Depot Report Send
Engine Refurb Send
Package Refurb Send
Repair Summary Send
Dual Fuel LM2500
Scope Of Supply
Send
50Hz,
LM6000
Scope Of Supply
Send
60Hz,
Dual Fuel LM6000
Scope Of Supply
Send
60Hz,
Gas LM6000
Scope Of Supply
Send
Search Icon

1,000+ Point Inspection

Prior to inspection, the package, including the gas turbine, generator, controls, major components, skids and package enclosures is disassembled into key modular units for documentation. Next, we perform extensive bore-scope and physical inspections. All parts are then evaluated, inventoried and stored in our environmentally controlled warehouse. Finally, our engineering and metallurgy teams collaborate to develop a full refurbishment strategy and project scope.

Controls Icon

Controls

Every ProCertifed package comes with a New Allen-Bradley turbine controls system, and generator controls system. The open architecture software provides easier upgrade and greater turbine access. You will never be locked out of your own system. We also provide customized solutions for both the excitation systems and generator protection.

Tracking Icon

Tracking

PROENERGY's proprietary real-time tracking software, SPIN, provides an unprecedented level of transparency. Every ProCertified turbine includes an in-depth report detailing all phases of the overhaul process, complete with images, analysis and completion dates.

Certification Icon

Certification

Being ProCertifed means your turbine or equipment has completed a rigorous 1,000+ point inspection, followed by a complete disassembly and condition-based overhaul utilizing new or fully restored components. Each process is meticulously documented, photographed and scrutinized by our PROENERGY engineering team. Finally, it is inspected and thoroughly tested prior to receiving the ProCertifed designation.

Overhaul Icon

Turbine & Generator Overhaul

No two overhauls are alike, so we've optimized our repair processes to maximize quality and efficiency, which translates into value for our customers. This also means we can tailor the overhaul to meet your specific requirements or outcomes.

Ready-To-Fire Icon

Ready-To-Fire Parts

Never worry about long lead times while waiting for parts. PROENERGY maintains an extensive inventory of superior single-crystal super alloy components.

History Icon

History

Every ProCertitfed turbine or package is delivered with a complete, up-to-date history of the unit, including maintenance logs, outages, repairs and upgrades, much like a CARFAX® for your turbine. In addition, updated drawings and specifications are provided, detailing changes made by PROENERGY during the refurbishment process.

Turbine Icon

Turbine Leasing

A unique benefit to owning ProCertified equipment is the customer service that comes with it. We're so confident in our turbines that if anything should ever fail within the warranty period, we'll provide a lease turbine at no cost for removal, installation or shipping.

Warranty Icon

Warranty

All ProCertified turbines and equipment are confidently backed by a comprehensive warranty, you will not see anywhere else in the industry giving you added peace-of-mind and the assurance that you've selected the right equipment for your operation.

  • Date  1.26.15
  • Process  Turbine Enclosure
  • 1 of 15
  • Date  2.3.15
  • Process  Turbine Enclosure
  • 2 of 15
  • Date  2.11.15
  • Process  Main Turbine Terminal Panel
  • 3 of 15
  • Date  3.24.15
  • Process  Auxiliary Skid
  • 4 of 15
  • Date  4.23.15
  • Process  Inlet Volute
  • 5 of 15
  • Date  5.18.15
  • Process  Turbine Enclosure
  • 6 of 15
  • Date  6.10.15
  • Process  Balance
  • 7 of 15
  • Date  6.22.15
  • Process  Inlet Frame Installation
  • 8 of 15
  • Date  6.24.15
  • Process  Roof Skid (after)
  • 9 of 15
  • Date  6.30.15
  • Process  LPT Installation
  • 10 of 15
  • Date  8.18.15
  • Process  Turbine Enclosure (after)
  • 11 of 15
  • Date  9.2.15
  • Process  Generator Skid (in Paint Shop)
  • 12 of 15
  • Date  9.23.15
  • Process  Engine Test Fit
  • 13 of 15
  • Date  9.29.15
  • Process  Engine Test Fit
  • 14 of 15
  • Date  2.8.16
  • Process  Shipping to Site
  • 15 of 15